Specialised Ground& PAVEMENT PROCESSES

 
  • Some of the specialised techniques applied by the construction division in our value engineered solutions include:
  • High Impact Energy Dynamic Compaction (HIEDYC™)
  • Controlled Dynamic Compaction (CDYC)
  • Electro osmosis – Electrical Vertical Drains
  • Soil grouting for underpinning
  • Soil stabilisation –shallow and deep Soil mixing, Pug milling
  • Dry Stone and sand column piles
  • Dewatering – slurries and tailings
  • Stabilisation of pavements by polymers
 

The Solutions are delivered on a Total Solutions basis from

  • Assessing the ground conditions
  • Formulating ground engineering solutions
  • Executing the ground improvement
  • Validating the ground improvement
  • Design of economical foundations utilising the high strength of the improved ground thereby eliminating piling ( this is done in collaboration with the Client & their Engineers)
  • Design of economical pavements utilising the high strength of the improved ground (this is done in collaboration with the Client & their Engineers)
From This
From This...
...To this
...To this
 
Swampy ground converted to housing site.
Swampy ground converted to housing site.
Swampy ground converted to housing site.
Swampy ground converted to housing sites by CDYC & HIEDYC techniques
 

We have carried out ground improvement works on a design, construct and certify basis for a variety of sectors ranging from Civil. Mining Oil & Gas, Logistic ranging from Ports, Airports, Container terminals, Water and Waste treatment plants, Roads, Oil and Gas tank farms & pipelines, land development for industrial, commercial and residential projects, mining camp earthworks & foundations, mine haul roads.

Infra Tech has pioneered the approach of designing performance based pavements for freeways, container terminals and airports and has established themselves in the forefront of economical and sound pavement design and construction.

 
Dynamic Consolidation to accelerate settlement
Dynamic Consolidation to accelerate settlement
Completed 3 storey buildings
Completed 3 storey buildings